Transaction Templates, Gates and Approvals for Team Leads/TCs

Updated August 14, 2026

This is the builder side of Transaction Manager: how a team lead or transaction coordinator sets up phases, gates and approval requirements so the checklist your agents see in My Transactions actually enforces something — instead of just listing tasks nobody is required to finish before moving on.

Requires Ace Trove and Back Office's Transactions toggle left on (default on).

What you'll have when you're done

  • A checklist template with phases and a gate on each one that actually stops (or attests, or just advises) a deal from moving forward with work outstanding.
  • An approval requirement on the items that genuinely need a second set of eyes — a signed disclosure, a broker sign-off — without turning every item into a review bottleneck.
  • A board across every open deal your team is working, with overdue items, missing key parties, and pending approvals waiting on you.
  • An audit trail of every attestation, approval, and phase move, permanent and exportable.

Your first win, in about 10 minutes

  1. Open Back Office → Transactions in the Ace Trove group of the admin sidebar.
  2. Open Templates. Ace ships two research-backed starting templates (buyer-side, listing-side) built lazily the first time you read them — edit or delete them freely.
  3. Pick a template and open Phases. Each phase can carry a gate: leave it advisory for a heads-up, set it attested to require a logged acknowledgment, or set it blocking to genuinely require the outstanding items to clear first.
  4. If you set a gate to blocking, you must write the consequence — the real thing it protects (“closing without a signed disclosure exposes the brokerage”). Ace refuses to save a blocking gate with no stated reason; that one rule is what keeps this from turning into an unaccountable wall of red tape.
  5. Mark the two or three items that genuinely need sign-off (not every item) with the approval requirement, and set who can approve — TC or admin roles.
  6. Save. Existing rooms on the old template are offered a drift/sync so open deals don't silently fall out of date with your new rules.

The gate model

A gate strength is a deliberate choice, not a default:

  • Advisory — informational only, never stops anyone.
  • Attested — an agent (or TC) can cross by checking a box and stating why. That attestation is permanent: actor, timestamp, reason, and exactly which requirements were outstanding at the time. There is no override that leaves no record.
  • Blocking — the phase genuinely cannot be crossed until the requirements clear. When a forward move crosses multiple phases at once, Ace evaluates every gate in the span the move crosses, not just the destination — so a blocking gate two phases back can't be skipped by jumping ahead.

An item that stops applying (say, a financing-contingency item on a cash deal) is retired honestly: if nothing has been done on it, it's simply removed; if work is already logged, it's marked “not applicable” with a stated reason instead of silently vanishing and losing the record.

Approvals

Only items you mark approval-required park in a “submitted” state waiting on a reviewer — everything else auto-completes when the agent checks it, which is what keeps the 90% case a one-tap action instead of a review queue. A reviewer can accept or return with a note; a returned item's re-submission creates a new version rather than overwriting the old one, so the history of what was rejected and why stays visible.

When an agent needs a document released back to them (say, to correct and re-upload), the request shows up on your Releases queue and on the room itself — it's a real request-and-resolve loop, not a side conversation.

The board and the audit trail

The Back Office board shows every open room across the team: owner (or a named reason when unknown — never a fake “Unassigned”), phase, close countdown, checklist progress, overdue items, missing key parties, and pending approvals. Every phase move, attestation, approval, and document action lands in a permanent, exportable audit log — the record a broker review actually needs.

Frequently asked questions

What happens to open rooms on a template I change?
Ace never silently rewrites an in-progress checklist. You'll see a drift preview and choose whether to propagate the change; nothing done or waived is touched.

Can an agent skip a blocking gate?
Only if you set that gate to attested instead of blocking — and even then, every crossing is logged with a reason.

Does approving a document notify the client?
No. Nothing in Transaction Manager sends a message to anyone automatically — every notification stays internal to your team.

Can I export the audit trail?
Yes, as CSV, from the board.

Last updated: August 2026